Cog Icon signifying link to Admin page

Colwinston Community Council

Colwinston Fibre Optic Broadband Project

Added on 23 January 2020

Current situation – houses in the village on the 01656 exchange are connected by copper wire to the distribution box which in turn is connected to the national fibre network.  Broadband performance is generally between 10 and 30mb/s.  Houses on the 01446 exchange are connected with copper to Cowbridge and only get less than 4mb/s. They are not included in this project.

Proposal

OR to bring FOB to outside each house in the village to achieve a potential 1gb/s (1000mb/s)

Chosen ISP to take the connection into any house that chooses to upgrade at the outset

Other premises that choose not to connect to fibre will have fibre to the outside and continue with their current copper.  They will be able to connect to fibre in the future, at a cost.

Project cost

£50k+

To be covered by grants

OR will be paid direct by the Government body concerned

Grants – if the village has 10 businesses who will sign up that will cover the whole cost @ £5500 each.  If not we need some private houses to make it up @ £800 each. 

Upfront costs to premises – ISP’s vary with some including the modem/router in the rental. Private houses that wish to connect at the outset can have the final connection charge covered by a grant – to be confirmed.

Running costs – ISP’s vary but for 1gb/s connection first year £32/45pm and subsequent years £50/60pm.  Private houses who do not apply for the grant will continue with their present arrangement

Next steps

We will be making contact with residents and businesses in the near future to establish who wants what and is willing to help apply for grants.  We are assured there will be no cost to individuals for the basic fibre installation, only if residents have a connection into their premises.

Any thoughts, comments, questions etc please email carlhadley@outlook.com

^